СПб · Ленобласть•On-site measure within 1–3 days•In-house production•1-year warranty•ISO 9001:2015
Blog5 min read

Heating the edge of a glass canopy in winter

Why heat, how it works, power consumption. Real SPb operating data.

Ultra-realistic_architectural_photography_of_a_202606141653

Glass canopies accumulate ice in winter — meltwater by day, freezing by night. Ice weighs the structure and slides off as "blocks" at the worst moments (passers-by). Edge heating solves both.

01How it works

A heating cable 25–45 W/m runs along the bottom edge (in the drainage profile). Thermostat-controlled, kicks in at −2 to +2 °C (the dangerous range). Doesn't run below −15 °C (powder snow, no blocks).

02Power use

LengthPowerSeason use
2 m50 W~30 kWh (180 ₽)
4 m100 W~60 kWh (360 ₽)
6 m150 W~90 kWh (540 ₽)
10 m250 W~150 kWh (900 ₽)

Real SPb 2024–2025 data: heater runs avg 320 of 4 320 winter hours (7.4%). Cost is negligible.

032026 prices

LengthWith install+ programmer
2 mfrom 18 600 ₽+8 400 ₽
4 mfrom 28 800 ₽+8 400 ₽
6 mfrom 38 400 ₽+8 400 ₽
10 mfrom 58 600 ₽+12 800 ₽
For storefront canopies on SPb main avenues — heating is mandatory. 30–60k ₽ pays back by avoiding a single injury claim. For private dachas — usually overkill.

04Alternatives

  • Steep slope (5°+) — snow slides naturally
  • Hydrophobic coating on lower edge
  • Manual stick-knocking by janitor (unreliable for commercial)

05This service at REAL GLASS

If you've read this far, the topic is probably relevant to a real project. We make glass canopies in-house in St. Petersburg, with a measure within 1–3 days, 1-year warranty and a fixed contract price. All numbers in this article come from our actual 2026 quotes.

For a project-specific estimate — see the service page or request a free on-site measure.

Call us